Announcement

Migration of this forum

Dear users of this forum,

we are pleased to inform you that we will be updating the software behind this forum in the near future.

Existing posts, users and categories will remain untouched.

Important:

  • Each user will need to reset their password.
  • Please select "I forgot my password".
  • Enter the email address you used to register in this forum.
  • You will receive an email with a link to set a new password.
  • Please choose a new (secure) password and confirm the process.

We will keep you informed in the pinned thread.

Kind regards,
Your ReportServer Team


Migration des Forums

Liebe Nutzer dieses Forums,

wir freuen uns, euch mitteilen zu können, dass wir in naher Zukunft die Software hinter diesem Forum aktualisieren werden.

Existierende Beiträge, Nutzer und Kategorien bleiben weiterhin bestehen!

Wichtig:

  • Jeder Nutzer muss sein Passwort neu vergeben.
  • Wählt dazu einfach "Ich habe mein Passwort vergessen".
  • Gebt die E-Mail-Adresse ein, mit der ihr registriert seid.
  • Ihr erhaltet eine E-Mail mit einem Link zur Passwortvergabe.
  • Bitte wählt ein neues (sicheres) Passwort und bestätigt den Vorgang.

Wir halten euch im angepinnten Beitrag auf dem Laufenden!

Mit vielen Grüßen
Euer ReportServer Team

#1 2017-06-14 07:33:47

Alvaro
Member
From: Spain
Registered: 2017-06-13

Scheduling without saving a variant

Good morning,

I have a doubt regarding RS scheduler: Is there a way to schedule a report with a specific parameters without saving any variant of it? If I try to schedule a report with parameters without a variant it uses the default report parameters instead.
I need to do this because I need some users to be able to schedule reports but I don’t want them to have writing permissions, which are needed to save variants.

Thank you and best regards,
Álvaro

Offline

#2 2017-06-14 07:38:43

IF_Eduardo
Administrator
Registered: 2016-11-01
Website

Re: Scheduling without saving a variant

Hi Alvaro,

Only variants can be scheduled. But you don't need write permissions in order to schedule a report (variant). You need "Scheduler" permissions:
https://reportserver.net/en/guides/admi … anagement/

    Scheduler. The generic right Scheduler controls the access to the user components of the Scheduler module. The reading right enables users to open the Scheduler module in order to edit the orders they scheduled before. The execute right enables to schedule reports.

So your users should be able to schedule reports without having writing permissions. Their variants must be previously saved though.

Regards,
Eduardo

Offline

#3 2017-06-16 08:22:12

Alvaro
Member
From: Spain
Registered: 2017-06-13

Re: Scheduling without saving a variant

Dear Eduardo,

Thank you for the explanation.
If I understood well, a system administrator must create a variant which users are able to schedule?
I have created a test user with access to the scheduler but it can't save variants.

Best regards,
Álvaro

Offline

#4 2017-06-16 08:26:41

IF_Eduardo
Administrator
Registered: 2016-11-01
Website

Re: Scheduling without saving a variant

Alvaro wrote:

test user with access to the scheduler but it can't save variants

Hi Alvaro,

the system administrator should save the variants, not the test user. If I understand correctly, you are trying to save a variant with the test user. So the steps are:

1. System administrator sets all parameters, filters, etc for the required report.
2. System administrator saves the variant e.g. "myVariant"
3. Test user (with scheduler permissions) opens "myVariant"
4. Test user schedules "myVariant". Test user cannot change "myVariant", only schedule it.

Best regards and have a nice weekend,
Eduardo

Offline

#5 2017-06-16 11:29:40

Alvaro
Member
From: Spain
Registered: 2017-06-13

Re: Scheduling without saving a variant

Dear Eduardo,

Yes, that's the point of what I was asking. Thank you for the clarification.

Thanks, have a nice weekend you too smile

Álvaro